Grand Parkway:

Contractor(s): Park Construction | BGE

  • 07/31/2026 – 08/31/2026: NB SH-99 outside lane frontage road closure at Peek Rd. Long Term continuously closed.

Contractor(s): BGE

  • 8/11/2026 – 8/13/2026: EB/WB main lane alternating rolling lane closures on the Grand Parkway from Fry Rd. to Sansbury BLVD. Closures from 8:00 am to 4:30 pm. Daily.

Westpark Tollway:

Contractor(s): BGE

  • 8/11/2026 – 8/13/2026: EB/WB main lane alternating rolling lane closures on the Westpark Tollway from FM 1463/FM359 to Westheimer Place Dr. Closures from 8:00 am to 4:30 pm. Daily.

Fort Bend Parkway:

Contractor(s): BGE

  • 8/11/2026 – 8/13/2026: NB/SB main lane alternating rolling lane closures on the Fort Bend Parkway from BW-8 to Sienna Ranch Rd. Closures from 8:00 am to 4:30pm Daily.